Riverside embankment construction

Scope:

Combiwall construction for temporary embankment

Equipment:

Modular Jack-Up Barge "JB-104"

Date:

02 mei, 2018

Location Icon

Location:

United Kingdom

In the summer of 2018, JB-104 was deployed on river Thames, right next to the famous Blackfriars Bridge in central London, UK. We assisted there on the construction of London's "Thames Tideway Tunnel" project, a massive upgrade to the city's sewer system running under river Thames from West London all the way to the Thames Estuary. Main scope of work for JB-104 was piling and drilling works for the construction of a temporary embankment. 

KEY PROJECT FEATURES 

  • HUGE SEWER SYSTEM UPGRADE PROJECT
  • SHEETPILE & COMBIWALL INSTALLATION
  • EYE CATCHING PROJECT LOCATION
  • QUICK MOBILISATION BY SEMISUB VESSEL FROM MARSEILLE TO LONDON