In the period 2019 - 2023, our modular jack-up barge JB-108 supported ITD Cementation India on their deepwater jetty dry bulk terminal construction project in Udangudi, Southern India. JB-108 was a decisive tool for this project, in which she was mainly engaging in piling, concrete batching, and heavy lifting operations. We are proud to say that throughout the challenging Covid-19 global epidemic circumstances, we managed to continue our service. On the basis of this succesfull co-operation, we built a relationship of trust with ITD Cementation and local supply chain partners, which continues until this day.
KEY PROJECT FEATURES
- 8 kM lONG DEEPWATER JETTY IN OPEN SEA
- CHALLENGING SWELL CONDITIONS
- PILING, CONCRETE BATCHING, HEAVY LIFTING
- JB-108 KEY ELEMENT OF pROJECT WORKS
- YEARS LONG TRUSTED RELATIONSHIP BUILT WITH CLIENT
Frequently asked questions
The JB-104 has a maximum payload capacity of 400 tons, depending on load distribution and operational conditions.
Current: up to 2.0 m/s; Wind: up to 13 m/s; Wave height: 2.0 m preload / 1.0 m touch-down.
The JB-104 is equipped with 47.4-meter legs, a jacking stroke of 1.5 meters, and a jacking speed of approximately 15 meters per hour.