Container terminal expansion

Scope:

Piling & heavy lifting

Equipment:

Modular Jack-Up Barge "JB-104"

Date:

20 dec, 2023 – 21 aug, 2025

Location Icon

Location:

Sri Lanka

Our modular jack-up barge JB-104 was deployed on a project of crucial national interest to Sri Lanka – the expansion of a container terminal at the Port of Colombo.

Strategically positioned in the Indian Ocean along major East–West international shipping routes, the Port of Colombo represents one of South Asia’s key container transshipment hubs. The project contributed to expanding port capacity and strengthening Sri Lanka’s position in global maritime trade.

Addressing Geotechnical and Operational Challenges

Marine construction projects of this nature involve significant geotechnical and operational challenges, including seabed bearing capacity, foundation stability, dynamic loads and the influence of marine conditions.

The self-elevating design of JB-104 provided a stable working platform, supporting piling and heavy lifting operations during the container terminal expansion.

How JB-104 Adds Value

Designed for demanding marine construction activities, JB-104 provides:

  • A stable and elevated working platform for heavy construction equipment.

  • Reduced influence of waves, currents and sea level fluctuations on the working platform.

  • Reliable support for piling and heavy lifting operations.

  • Increased operational flexibility in marine environments.

  • Support for safe and efficient marine construction operations.

International Equipment Mobilization

Following several charter projects and a drydock session in Mumbai, India, JB-104 was mobilized by sea towage to Colombo, Sri Lanka, where it supported the execution of this strategic infrastructure project from December 2023 to August 2025.

KEY PROJECT FEATURES 

  • CONTAINER TERMINAL EXPANSION
  • PROJECT OF CRUCIAL NATIONAL INTEREST
  • PILING, HEAVY LIFTING